Sahalovy.ch logoSahalovy.chOleksii Sahalovych
Technical review

Technical red flags

Red flags in vacuum, plasma, coating, LPC, cathode and TVAC reviews.

Evidence

Engineering assessmentRed flagsRequired recordsProject-specific checks
Vacuum equipment
Red flagTechnical riskCorrect record
Ultimate pressure without pump-down curveno separation between pumping capability, leaks, conductance and outgassingpressure-time curve with chamber volume and pumping configuration
Nominal pump speed onlyeffective speed at chamber may be much lower due to duct conductanceSeff estimate or gas-load test at chamber
No pressure-rise testreal leak, virtual leak and outgassing are not separatedisolated chamber pressure-rise curve
No helium leak-test reportleak-tightness is not verifiedhelium leak detector record with acceptance criterion
FAT without raw logsacceptance depends on undocumented snapshotstime-stamped pressure, gas, temperature and alarm logs
PVD / CVD coatings
Red flagTechnical riskCorrect record
Coating photo without cross-sectionappearance does not confirm thickness, architecture or adhesioncross-section, thickness and interface record
Hardness stated without load/methodvalue cannot be compared or reproducedtest method, load, substrate, coating thickness
Tribology result without counterbody and environmentfriction/wear result is not transferableload, speed, counterbody, lubrication/medium, temperature
Route name instead of process windowPVD/CVD label hides critical plasma, temperature and source conditionsprocess parameters and acceptance coupons
No adhesion or interface datafunctional failure may occur even when coating looks uniformscratch/indentation/adhesion data and microscopy
Plasma nitriding / duplex treatment
Red flagTechnical riskCorrect record
Nitriding claim without hardness/profile datatreated layer depth and uniformity are unknownhardness profile, microstructure, diffusion depth
No part temperature recorddimension, phase state and surface quality may be affectedtemperature log and fixture/load description
Duplex route without support-layer datacoating may fail under load despite good adhesion testsupport-layer depth + coating cross-section
No surface roughness before/aftertribology and sealing performance may changeRa/Rz before and after process
LPC / vacuum heat treatment
Red flagTechnical riskCorrect record
LPC recipe without carbon profilecase depth and surface carbon are not demonstratedcarbon profile and hardness profile
HPGQ claim without cooling datamicrostructure and distortion risk are not controlledcooling curve, gas pressure, hardness and distortion records
No TUS / temperature uniformity discussionload temperature may differ from controller temperaturethermal uniformity data or load thermocouple record
Material certificate absentsteel response and hardenability cannot be assessedsteel grade, heat, chemistry and prior heat treatment
Cathode / TVAC / EP test
Red flagTechnical riskCorrect record
Single cathode ignition presented as validationno stability, restart or drift informationI-V curves, restart cycles and emission drift
Empty-chamber base pressure used for EP test readinessoperating pressure under xenon/gas load may be too highgas-load test and effective pumping estimate
No contamination-control recordoptical surfaces, cathode and thruster can be affectedcleaning, witness samples and post-test inspection
No diagnostic layouttest may be impossible to interpret after assemblyports, line-of-sight, feedthroughs, OES/electrical layout

Application link

Application Map

Scientific interpretation of red flags

Red flag assessment: a weak record does not prove failure. It marks where the physical mechanism, boundary condition or measurement record is insufficient for a technical decision.

Missing recordScientific ambiguityNext record
No pressure-rise curveLeak, virtual leak and outgassing cannot be separated.Q = V · dP/dt with chamber state.
No coating cross-sectionLayer thickness, interface and defect state remain unknown.Cross-section and thickness map.
No hardness / concentration profileDiffusion case cannot be tied to process route.Depth profile and thermal record.
No drift / restart dataCathode start is not separated from stable operation.Fixed-point drift and restart cycle record.

Basis

Record
Missing or weak checks: no cross-section, no pressure-rise test, no raw logs, no profile, no stability data.
Interpretation
Red flags identify where a claim is under-supported or technically ambiguous.
Project use
A red flag does not prove failure; it marks where further records are needed.