Sahalovy.ch logoSahalovy.chOleksii Sahalovych

Consulting

Independent technical support before equipment purchase, supplier selection, FAT/SAT acceptance, process transfer or industrial implementation of vacuum, plasma and surface-engineering technologies.

Consulting packages

RFQ & Supplier Proposal Review

Review of supplier proposals, RFQ documents and acceptance assumptions for vacuum, plasma, coating and thermal-processing equipment.

The typical output is annotated comments, a technical risk list, supplier questions and FAT/SAT notes. This is useful before contract commitment or technical acceptance.

Vacuum Furnace / Coating Equipment Specification Review

Review of chamber, pumping, heating, gas, control, diagnostics and process requirements against the intended industrial use.

The typical output is specification comments, missing requirements and an acceptance checklist. This is useful when an offer looks plausible but still needs independent engineering review.

PVD/CVD/PECVD Coating Center Concept

Support for planning in-house or service coating capability: process scope, equipment configuration, workflow, applications and quality-control chain.

The typical output is a concept note, process map, equipment outline and staged implementation plan. This is useful before investing in coating-center capability.

Thermal-Vacuum / Space Simulation System Review

Review of high-vacuum and thermal-vacuum test infrastructure, including pumping concept, xenon gas load, contamination, diagnostics and integration.

The typical output is system review notes, an interface list, FAT questions and acceptance recommendations. This is useful when test infrastructure must support plasma, xenon or high-vacuum conditions.

Surface Engineering & Process Industrialization Support

Support for turning a coating, nitriding, LPC or vacuum heat-treatment route into a testable and industrially realistic process.

The typical output is a process-route recommendation, test plan, failure analysis or decision memo. This is useful when coating or treatment performance must be judged as an engineering route.

Example project types

PVD coating center concept

Matching process scope, equipment configuration, workflow and quality-control method.

Vacuum furnace RFQ review

Review of requirements, supplier offers and acceptance criteria before procurement or FAT/SAT.

Thermal-vacuum test system review

Assessment of chamber, pumping, xenon, contamination and integration assumptions.

Surface engineering for critical components

Selection or review of coating, nitriding, carburizing or heat-treatment routes.

Coating / process troubleshooting

Review of unstable process results where material, equipment and diagnostics must be considered together.

Send project details

Briefly describe the equipment, process, supplier offer or technical decision that needs review.